Monday-Sunday 9905700700 | 9431725416
Your Cart (Items: 0)

No products in the cart.

sales@dhanbadengineering.com Dhanbad Engineering, Katras Road, NH-32, Dhanbad

FAQ’s

Check Our

Frequently Asked Questions

01.What do we mean by drilling?

Drilling is the process of extracting statistics from under the surface with the use of a huge drill rig. This may be done to determine the sort of rocks present, as well as groundwater information well as aquifers, and the geothermal gradient.

02.How do you control your quality?

From checking to inspecting we test every tool before packing and shipment.

03.How do you do the packaging of the goods?

Generally, we pack our goods in wooden boxes along with foam.

04.What are your terms of delivery?

FOB, CFR, CIF, EX-WORKS, ETC

05.What is your delivery time?

Generally, it takes 10-15 days after receiving an advance deposit. The specific delivery time depends on the items and quantity of your order.

06.Can you produce goods according to samples?

Yes, we can produce goods as per your samples or technical drawings.

07.Are you a manufacturer, trading company or a third party?

We are a manufacturer and we have been manufacturing since 1976.

08.Is your price competitive?

We manufacture only best quality goods, surely, we give best competitive price to our customers.

09.May I know which payment will be accepted by your company?

By CHEQUE, RTGS, NEFT, T/T, PAYPAL

010.How can I get after sale service and warranty service?

Any quality or quantity problem once confirmed, will compensate you the same. We will send you the tools free of cost.

011.What is the raw material grade that you use?

Normally we use alloy steel grade to manufacture our tools.

012.Do you agree sample orders?

Yes, we always welcome your sample orders for presenting our optimum quality.